How Inactive Pitches Affect OEE and Uptime
Last updated: November 20, 2026
Overview
Whether a pitch is active or inactive changes which time counts toward OA (Uptime %) and OEE. This explains why OEE can change when you inactivate a pitch that had no production.
Active pitches
An active pitch counts as planned production time. Every active pitch with recorded actuals, scrap, or downtime contributes to your metrics.
Example: An active hour with 0 actual, 0 target, and 60 minutes of downtime is an hour with 0% availability and no production. It lowers the line's Uptime % and OEE %.
Inactive pitches
An inactive pitch is treated as time the line wasn't scheduled to run. L2L removes it from the OEE calculation completely, including its planned time and any downtime logged against it.
Why can a line that did not run show 100% OEE?
This usually happens when the line was still scheduled and its pitches were left active, but nothing was recorded on those pitches.
A common example looks like this:
The shift is scheduled for the day.
Each pitch has planned production time and Active = True.
Demand, actual, operators, and downtime are all left at 0.
Because no downtime was logged against those active pitches, Uptime can remain 100%.
With no production or scrap recorded to pull the other factors down, reports such as the OEE Pareto can show the line at 100% OEE even though it did not run.
What should I do?
If the line was not supposed to run, set those pitches to inactive so they are excluded from OEE.
If the line was supposed to run but was down, keep the pitches active and record the downtime so the loss is reflected in OEE.
Why might one view show 0% while another shows 100% for the same period?
If a line was scheduled but had no actual production and no downtime recorded, that period is effectively undefined for OEE interpretation. In current L2L behavior, different views can present that undefined case differently.
For example:
a dashboard may show 0% for that period, while
the OEE Pareto may show 100%.
This does not mean one view found recorded production and the other found recorded downtime. It means the same "scheduled but nothing happened" period is being visualized differently depending on the report or dashboard.
The best way to make the metric meaningful is still the same:
If the line was not expected to run, set the pitches to inactive.
If the line was expected to run but did not, leave the pitches active and record the downtime.
Why does site-level OEE go up when I inactivate a pitch with no production?
At site or line level, OEE is calculated across all active pitches. Removing a pitch that had only downtime gives more weight to the remaining active pitches, so OA and OEE rise.
Example:
Line A has two pitches, each with 60 minutes of downtime.
Line B has two pitches with no downtime and recorded actuals.
Site-level OA for those two hours is 50%: 120 of 240 minutes are down.
Inactivate one of Line A's downtime pitches and only three pitches are counted. OA rises to 66.67% and OEE rises too.
When to inactivate a pitch
Situation | What to do |
|---|---|
The line wasn't meant to run (no crew, no orders, planned shutdown) | Inactivate the pitch. The hour never belonged in OEE, so the higher number is more accurate. |
The line was meant to run but was down (breakdown, waiting on material, equipment issue) | Leave the pitch active with its downtime. Inactivating it hides a real loss and makes OEE look better than it is. |
Caution: Inactivating a pitch clears its production data. Don't inactivate pitches that have actuals. (If your actuals come in via API; they can be retrieved).